New Quebra-Mar: Santos opens new spaces with Primavera Criativa programming

To celebrate the arrival of the new station, Novo Cobra-Mar, in Santos, will hold a special program with Primavera Criativa, this Saturday (24), at 3:00 p.m., with the opening of a space for shows and events and a new complex. of the avenue. The main attraction for Santos and tourists to travel.

The news does not stop there. The grandstand next to the Jurados do Surfe tower will be handed over after structural restoration and will be used both to accompany sports competitions and to watch shows in the new space. The food court area will also be finished, with Portuguese paving modeled after Santos Beach.

According to the Minister of Infrastructure and Buildings, Larisa Oliveira Cordeiro, the openings are part of the proposal to deliver the works in stages.

Roberto Mario Santini Park, in José Menino, is becoming a reference in Olympic sports, as well as a place of fun and observation for people of all ages.

“The Novo Cobra-Mar is an important space for the city, reformulated to accommodate the residents of Santos and tourists, in addition to the various attractions of this phase of the work, such as the stage in the shape of a surfboard, which will contain five Olympic methods: skateboarding, with an official track designed under the guidance of the Brazilian confederation of the category, a climbing wall , pump track for bikes and skateboards, 3×3 basketball and the surfing platform, with the structure of the last three bikes already ready,” he said. Mayor Rogerio Santos.

creative spring

The activities this Saturday, all scheduled for 15:00 at Novo Cobra-Mar, are part of the schedule of the second edition of Primavera Criativa. As a musical attraction, Jose Simonian and Club do Chorro perform in the new space at Amissario, staged by Gilberto Mendes.

Additional spaces already delivered from the park were also included in the schedule. Skaters present the Street method on the Pump Track (a circuit with speed bumps also used by cyclists).

At the same time, there will be a special skating exhibition on the sports track, and two 3×3 basketball teams will face each other on a field specially designed for the category.

The Novo Quebra-Mar will also receive four Instagrammable totems and will be the end point of the ‘Primavera com Muretas na Orla da Praia’ walking tour, which will depart from Praça das Bandeiras (Gonzaga) at 10am and 2pm on the 24 . and 25 (Saturday and Sunday). To participate, simply show up at the meeting place a few minutes before departure.

Finally, the park will be a meeting place for cyclists who will participate in the ‘Pedalando pela Vida’ solidarity bicycle journey that will leave at 10 a.m. on a 10 km route to Praça Mauá (city center). The attraction will collect food for the Santos Social Solidarity Fund and must count on the participation of More than a thousand people. There is also no need to register to participate.

The actions of the second edition of Primavera Criativa are supported by Construtora Âncora.

The spaces have already been delivered

Since June of this year, Novo Cobra-Mar has a skating rink, a 3×3 basketball court and the sculpture of the plastic artist Tomi Ohtaka, completely restored, with a new perspective, in addition to the first section of the central avenue. Works under the responsibility of the Department of Infrastructure and Buildings (Sidi).

The pub lane, the pet space and part of the main boulevard opened in December last year. The voids, the first phase of work on the new Cobra-Mar, were carried out by the Department of Public Services.

Interactive source

The interactive fountain, a water park that will have Instagrammable equipment, is under construction and should be delivered by the end of the year. The equipment is part of the second phase of the works, which also includes maintenance of the Surfing Museum and Radical Surfing School, in addition to others delivered in June.

13.4 million US dollars are spent on the work, under the responsibility of Sidi, of which 9 million US dollars from the state government, through an agreement with the Department of Regional Development (SDR) and the permit, a counterpart of the municipality. Starting in February, the second phase of the works should be completed in the first quarter of 2023.

Playground

The third phase of work on Novo Cobra-Mar, which highlights the implementation of a playground with toys on themes related to tourist attractions and brands in Santos, is still underway. Preliminary work is the placement of coating, topography and installation of machinery, while finalizing the executive project.

This phase also includes the entrance porticos, renewal of the service roads, renovation of administrative buildings and public services. The work is to be carried out within 12 months, for 13.3 million US dollars. Of this amount, 10 million NIS are resources from the state, through Dedetor, and the rest, funds from the municipality.

Roller skates

The fourth phase of the work on Novo Quibera-Mar will be the implementation of a skatepark, a skatepark suitable for international circuits. The work, worth US$3.3 million, will begin as soon as the election is over, as it will use federal funds, and should be delivered eight months after work begins.

The skatepark will have a total area of ​​1,928 square meters and will be divided into two parts, Flowpark and Street, connected to each other and with the function of serving the two modes that are part of the Olympic program.

The skating rink project was prepared in accordance with the rules of the Brazilian Sports Confederation, to make the rink in Roberto Mario Santini Park suitable for hosting international competitions and circuits.

Leave a Comment

Your email address will not be published.